Our client provided us with a fire stopping report. A surveyor reported that breaches through the existing fire wall were not adequately fire stopped.
Erected scaffolding around the designated work areas, to allow safe access at height to penetrations through fire wall.
To install intumescent batt pattresses to service penetrations through fire wall. This ensured a 60 minute fire rating.
Certification of works was issued upon completion and the project was delivered in a timely manner.